TuffWrap kept a production facility up and running. Frameless Walls were used to keep a drugmaker’s production floor open during the installation of new equipment.
When a pharmaceutical manufacturer decided to renovate and expand its facility, it ran into a problem. The renovations, which included the installation of new equipment, risked shutting down the production line. They needed a way to perform renovations without throwing dust and debris into the manufacturing area.
Fortunately, the project manager reached out to TuffWrap for assistance. The solution to their problem was one of Tuffwrap’s signature Frameless Walls. The wall was used to separate the active lines from the construction, meaning sales activity wouldn’t have to slow down to accommodate the work. A durable Pocket Door ensured that crew and employees had easy access to and from the showroom.
When the job was done, the pharmaceutical client was thrilled with TuffWrap’s solution to the problem. Without having to divert resources to coordinating installation and shutting down the showroom, they were able to maintain their regular schedule without interruption.