TuffWrap kept a launch support facility up and running. Industrial Hybrid Walls were used to keep a vital equipment hub protected during construction.
When an aerospace company started to modify its launch facilities to accommodate a larger project, it ran into a problem. The work involved demolishing one of the existing walls, which would produce dust and debris. While the area was being worked on, they needed a way to protect the important mechanical and electrical equipment from contamination.
Fortunately, their facility manager reached out to TuffWrap for assistance. The solution to their problem was a line of Tuffwrap’s signature Industrial Hybrid Walls. The walls were used to separate the work and clean zones, and 8′ plywood reinforcements were attached to improve the walls’ durability.
When the job was done, the aerospace client was thrilled with TuffWrap’s solution to the problem. The temporary solution kept equipment protected against dust and debris, and was durable enough to withstand daily vehicle traffic until the demolition and construction was completed.